After a couple of rainy days, our busy block-laying crew is about 95% complete. I am extremely pleased with the great work this crew has done. Instead of relying only on strings to keep the walls level and true, there was a transit on site that was used to shoot elevations as the walls went up. A lot of block layers would not do this. If the rain holds off for a few more days, we should have the basement floor poured and be ready to start putting up floor joists next week.
Wednesday, August 29, 2012
Sunday, August 26, 2012
Foundation Work Continues
When I first starting the design process for this house, I had thought I would have the foundation out of poured concrete. This seemed to be the current trend and the way many home builders were going. However, as the budgeting process ensued, I realized poured basement walls were extremely expensive and really did not offer any advantages over one built from concrete blocks (or CMUs as they are sometimes called). With proper waterproofing and drainage provisions, the block walls should never leak and provide a much better looking wall, in my opinion. So, the block-laying process began with a very experienced crew doing the work. As the walls went up, they were straight and true and my confidence build that this was going to be a well-built foundation.
In case I mislead anyone into thinking that I am doing all the work on this house, I want to be quick to say that I am most fortunate to be working with the principal contractor for this job, Ben Beatty. Ben has built many houses in this area through the years and he has built a great reputation. I am hoping he will be able to take my design concept and make it work. So far, things have gone well. He has been a pleasure to work with already and I am looking forward to working with him through the whole process. The other contractors who have worked with us on this, so far, are DeWayne and Scotty Grier who have done the excavation and concrete work and Joe and Tom Smith who are doing the concrete block laying.
In case I mislead anyone into thinking that I am doing all the work on this house, I want to be quick to say that I am most fortunate to be working with the principal contractor for this job, Ben Beatty. Ben has built many houses in this area through the years and he has built a great reputation. I am hoping he will be able to take my design concept and make it work. So far, things have gone well. He has been a pleasure to work with already and I am looking forward to working with him through the whole process. The other contractors who have worked with us on this, so far, are DeWayne and Scotty Grier who have done the excavation and concrete work and Joe and Tom Smith who are doing the concrete block laying.
Putting Down a Firm Footing
I would venture to say one of the least romantic phases of the construction process would be the foundation work. Who can really get excited about a bunch of trenches dug in the dirt and slabs of concrete? That would probably stand true for many but not for me. I personally have gotten a thrill from watching the process of anchoring this house to the ground on which it will stand. I certainly have not taken any of this process for granted.
During the 30 years my parents have lived on this land, I have heard hundreds of times how rocky this hilltop is. My mom has dug thousands upon ten thousands of rocks out of the earth as she and my dad have cultivated and landscaped the property. Though I do not have a background in civil engineering, I know enough to say that this rocky ground makes excellent support for a house foundation. So, it is with confidence that I can say that this house is going to stand on solid ground.
During the 30 years my parents have lived on this land, I have heard hundreds of times how rocky this hilltop is. My mom has dug thousands upon ten thousands of rocks out of the earth as she and my dad have cultivated and landscaped the property. Though I do not have a background in civil engineering, I know enough to say that this rocky ground makes excellent support for a house foundation. So, it is with confidence that I can say that this house is going to stand on solid ground.
Wednesday, August 22, 2012
Digging Deeper
With half of the year gone, in July, we finally sold and closed out our house in Columbus, GA making way for our house building plans to move ahead. Our lot had sat untouched since January of this year and aside from some minor soil erosion, everything looked as it did when the equipment vacated the premises. Since our house is to have a full basement a good bit of excavation still needed to be done. So, on Monday, August 13th, we once again broke ground and dug deeper.
It is amazing how much dirt came out of this hole but it was put to good use on the driveway to level and better prepare the road bed.
After removing many truckloads of good rocky soil well suitable for a good firm foundation, we were ready to layout and prepare the footings.
It is amazing how much dirt came out of this hole but it was put to good use on the driveway to level and better prepare the road bed.
After removing many truckloads of good rocky soil well suitable for a good firm foundation, we were ready to layout and prepare the footings.
Monday, January 16, 2012
Making a Level Spot
The felling of trees has always been something that has concerned me. I have often thought upon seeing countless housing developments that too many trees get sacrificed for want of open space. Our decision to put a house in Through the Woods brought with it the realization that space had to be made; but we still wanted that space to be made cautiously. When all the tree clearing was complete, however, it looked like we were not too cautious. The seemingly vast open space that was created looked like it could contain the footprint of the new Freedom Tower in NYC!
In addition to the absence of trees was the gash we put in the hillside. It was hard to grasp exactly how much the ground sloped with all the trees in place but with them gone, it became evident. In order to make a level place for the house and backyard pool, we had to take a sizable chunk out of the hillside. So now, we are faced with the necessity to build a retaining wall where a gentle slope once was.
But, we have a level space now. We have a platform from which to build and we can now begin laying out the area on which the house will stand.
In addition to the site clearing and leveling, we now have a nice road bed put down which will make it possible to get construction traffic to the building site. What started out as a wandering collection of stakes and flags marking the driveway through the woods has emerged as a well-built entrance to the home site.
So, now the clearing is done and, hopefully, all trees have been cleared. We now wait the time when we can proceed. But, we are hopeful it will be soon and in the meantime we have a blank canvas and the imagination with which to paint.
Tuesday, December 27, 2011
Site Clearing
It is hard to imagine exactly how a house site will look like when it is covered with trees. Unfortunately, when one is choosing a place on which to build a house, they must imagine the site with the trees gone. This is difficult to do.
Over a year ago the site for our house was chosen and, with the exception of minor changes, has remained the chosen location. Despite the fact that we are not quite ready to build, we decided to contract with a local equipment operator to clear the lot and build the road up to the lot. Our hopes are that this will be a way to advance the process at a minimum or expenses while we wait for our house to sell. The graciousness of our parents has made this possible. So, on Monday, December 26th, the power shovel bucket felled the first trees and an open site began to emerge from the forest.
Over a year ago the site for our house was chosen and, with the exception of minor changes, has remained the chosen location. Despite the fact that we are not quite ready to build, we decided to contract with a local equipment operator to clear the lot and build the road up to the lot. Our hopes are that this will be a way to advance the process at a minimum or expenses while we wait for our house to sell. The graciousness of our parents has made this possible. So, on Monday, December 26th, the power shovel bucket felled the first trees and an open site began to emerge from the forest.
Friday, December 23, 2011
Through the Gate
As surely as the seasons change, our lives constantly experience the ebb and flow of events that define who we are and what we have accomplished in this world. The danger of holding claim to the comfort of sameness lurks behind every decision that is made, every challenge that is laid down and every risk that is taken. The inevitability of change makes it even more difficult to believe that one should be surprised when it occurs.
One could call it a reaction to a "mid life crisis". Others would agree that it was a logical career change. Still, others would call it a hair-brained scheme to satisfy a swelling personal desire to find self worth. No matter what way it will ultimately be viewed, the decision to resign from a position at an excellent company and join a family business was made in late summer of 2010. The decision was not entered into lightly. Changes in the competitive landscape had made the challenge of running a business that depended solely on manufacturing industries very daunting. In consort with that was the ever-present myriad of dynamics coursing through the veins of a small family establishment. The delicate interplay between making "business" decisions and preventing hurt family feelings stood as a real challenge. Amid the diligent efforts to learn a new business and become a productive member of it, stood a looming reality that physical relocation had to happen. The years spent in this quaint Southern city we once called home would be coming quickly to a close.
This brings us to present time and an introduction to the intention of this blog and why it was created. Along with the decision to take a new job came the necessity to find housing in a new location and the opportunity to build a home. The hopes are that we will be able to design and build a home that possesses certain attributes we have always wanted. Presently, I still own a house in the city we have left and the sale of that house will ultimately determine the timetable for the building of a new one. We have, however, committed to keeping the faith that the Lord will guide us and allow events to happen in due time. In the meantime, though, the time will be used in design and planning. This blog will chronicle the building of our home. As a tribute to the way homes were built many years ago, we decided to build in the spirit of the early 20th century builders a Craftsman style house. The look with clean, simple lines and natural materials appealed to us.
This building process should prove to be an educational experience as most are. My inexperience with the trades needed to build a house hopefully will not overshadow my desire to be integrally involved. Regardless of the extent to which I will be lending a hand, the details will be here. Hopefully there will be others out there who will enjoy reading about the process and maybe even learning what to do and not to do. When my wife and I picked the spot for the house on a few acres in north Alabama, she told me she wanted to call the place "Through the Woods". Hence the inspiration for the title of this blog. I hope you enjoy it.